不擾民施工措施
為保證讓施工現(xiàn)場(chǎng)周?chē)膯挝、居民有一個(gè)良好的工作、學(xué)習(xí)和生活環(huán)境,在施工過(guò)程中要嚴(yán)格執(zhí)行以下不擾民施工措施:
1.晚上十點(diǎn)至早上六點(diǎn),原則上停止一切建筑施工活動(dòng),特別是噪聲較大的施工活動(dòng),以免影響周?chē)膯挝、居民的休息。不可避免要在該時(shí)段內(nèi)施工作業(yè),施工前要先取得周?chē)膯挝弧⒕用窕蚓游瘯?huì)的同意,并到政府有關(guān)部門(mén)辦理相應(yīng)施工許可手續(xù)。
2.施工過(guò)程中所產(chǎn)生的垃圾、廢水、廢氣等有可能污染周?chē)h(huán)境的,應(yīng)采取相應(yīng)措施及時(shí)處理,不可隨意傾倒、排放。
3.施工現(xiàn)場(chǎng)車(chē)輛進(jìn)出場(chǎng)時(shí),要避開(kāi)每日上、下班(學(xué))時(shí)段,不要造成施工現(xiàn)場(chǎng)周?chē)煌ú粫郴虬l(fā)生事故。
4.施工現(xiàn)場(chǎng)材料的運(yùn)輸車(chē)輛要沖洗干凈,方可進(jìn)出現(xiàn)場(chǎng),運(yùn)送散裝材料的車(chē)輛要有防止散落、飄落的措施,防止污染周?chē)孛。運(yùn)送砂、石的車(chē)輛在卸車(chē)時(shí),要避開(kāi)居民休息時(shí)段,以免卸料噪音影響他人休息。
5.施工過(guò)程中若造成周?chē)h(huán)境地面及空氣污染,應(yīng)及時(shí)中止施工并采取有力措施及時(shí)清理、整改。
6.施工現(xiàn)場(chǎng)周?chē)O(shè)置安全警示牌,提醒路人
Construction measures are not disturbing
To ensure that the units around the construction site so that residents have a good work, study and living environment, and in the construction process without causing an inconvenience to strict construction of the following measures:
1. 22:00 to 6:00 am, in principle, to stop all construction activities, particularly noisy construction activities, so as not to affect the surrounding units and residents in the rest. It's inevitable that construction jobs in the period, first to obtain pre-construction units with the consent of residents or neighborhood committees, and to the relevant government departments concerned construction permits.
2. Generated during the construction waste, waste water, gas and other pollution of the environment may be, shall take appropriate measures in time, can not be dumped at random emissions.
3. Played into the construction site vehicle, you should avoid daily commuting (school) hours, not to create bad traffic around the construction site or an accident.
4. Construction site materials transport vehicles to be washed clean before entering and leaving the scene, transporting bulk materials, vehicles have to avoid the scattered, falling of measures to prevent pollution of the surrounding ground. Transporting sand, stone unloading of vehicles, the residents of rest breaks to avoid, so as not to discharge noise of others rest.
5. Construction process, if the environment caused by air pollution in the ground and shall promptly take effective measures to stop construction and timely clean-up and rectification.
6. Set around the construction site safety warning signs to alert passers-by