一、工程概況
本工程位于×××××小區(qū)西區(qū)15、17、20#住宅樓工程位于北京市××區(qū)××村。北臨規(guī)劃××二號(hào)路?偨ㄖ娣e為50803m2。地下二層為五級(jí)普通人防,地下一層為設(shè)備間、自行車庫(kù)和管理用房,地上為住宅。
北京市地區(qū)的雨季施工為6月-8月,該季節(jié)的歷史平均降雨量為423mm,占北京市年平均降雨量的74%。期間有數(shù)次的大到暴雨天氣,局部地區(qū)可能出現(xiàn)洪澇災(zāi)害。因此雨季施工時(shí),應(yīng)與當(dāng)?shù)貧庀蟛块T密切聯(lián)系,注意收聽當(dāng)?shù)靥鞖忸A(yù)報(bào),做好預(yù)防準(zhǔn)備工作。
二、雨季施工原則
本工程雨季施工階段要完成主體結(jié)構(gòu)和二次結(jié)構(gòu)的施工。施工任務(wù)繁重,為確保工程質(zhì)量,搞好安全生產(chǎn),保證各項(xiàng)計(jì)劃指標(biāo)任務(wù)的完成,必須從思想上、組織上、措施上、物資上盡早做好充分準(zhǔn)備,做到思想落實(shí)、組織落實(shí)、措施落實(shí)、物資落實(shí)、汛期施工做到有備無(wú)患,雨季施工總的原則是“做好排水、擋水、防水工作”,總的要求是,室內(nèi)工程雨季不影響施工,室外工程小雨不間斷施工,大雨期間暫停施工,大雨過(guò)后即可施工,暴雨過(guò)后不影響施工。
三、施工準(zhǔn)備
3.1 組織準(zhǔn)備
為了保證在雨季施工期間,在發(fā)生大雨、暴雨天氣等險(xiǎn)情時(shí),能夠及時(shí)組織人員進(jìn)行搶險(xiǎn)救災(zāi),成立雨季施工領(lǐng)導(dǎo)小組。
組長(zhǎng):×××
副組長(zhǎng):×××、×××
組員:×××、×××、×××、×××、××、×××、××、×××
3.2 材料準(zhǔn)備 序號(hào) 材料名稱 單位 數(shù)量 備注 1 雨衣雨褲 套 200 2 雨鞋 雙 200 3 污水泵 臺(tái) 8 4 塑料布 M2 1500 5 鐵鍬 只 100 6 手推車 輛 30 7 防水電纜 m 500 8 編制袋 個(gè) 1000 3.3 技術(shù)準(zhǔn)備
雨季到來(lái)之前,組織有關(guān)人員按照方案要求進(jìn)行技術(shù)交底,提出雨施計(jì)劃,為施工提供技術(shù)準(zhǔn)備。
3.4 現(xiàn)場(chǎng)準(zhǔn)備
First, project survey
The project is located ××××× Western 15,17,20 # residential building residential project in the District, Beijing, × × × × village. × × II Road north plan. The total construction area of 50803m2. Basement level for the five common air defense, ground floor for the equipment, the bike library and administration buildings, land for residential.
Construction of Beijing area during the rainy season in June -8 for the month, the season's historical average rainfall 423mm, mean annual precipitation in Beijing accounted for 74%. There have been several rounds of heavy rain the weather, flooding may occur in some areas. Therefore, construction during the rainy season, should be closely linked with the local meteorological department, pay attention to listen to local weather forecasts, preventive preparations.
Second, the construction principle of the rainy season
Construction phase of this project to be completed during the rainy season the main structure and secondary structure of the project. Heavy construction tasks, in order to ensure the quality, improve safety, ensure that the plan targets completion of the task, must be ideologically, organizationally, measures and material as soon as possible fully prepared to do to implement it, the organization and the measures implemented, the implementation of materials, construction prepared and flood season, the rainy season the general principle of construction is "good drainage, retaining, waterproof work", the general requirement is that the rainy season does not affect the construction of indoor projects, outdoor projects ongoing construction of light rain, heavy rain During the suspension of construction, the construction can be heavy rain, rainstorm does not affect the construction.
Third, construction preparation
3.1 Organization of preparation
To ensure the construction period in the rainy season, in the event of heavy rain, heavy rain and other dangerous situations, the timely rescue and relief organization personnel, the establishment of the Leading Group for Construction during the rainy season.
Leader: × × ×
Deputy head of the :×××,×××
Crew :×××,×××,×××,×××,××,×××,××,×××
3.2 Materials preparation material name number number of units Note 1 raincoat rain boots rain pants sets 2002 double 2003 sewage pump station 84 plastic sheeting M2 1500 5 100 6 spade only waterproof cable trolley car 307 m 500 8 1000 3.3 Technical preparation of bags were ready
Before the rainy season, were organized to carry out technical disclosure in accordance with program requirements, make rain facilities plan to provide technical preparations for the construction.
3.4 site preparation