沈陽華銳世界廣場一期工程地下室后澆帶封擋施工方案.doc
進入下載頁
華 銳 世 界 廣 場 一 期 工 程
地下室后澆帶封擋施工方案
為保證華銳世界廣場一期工程在冬期施工前能夠提前進行地下結(jié)構(gòu)工程的封擋圍護,并確保地下室外防水和回填土工程的順利進行,初步擬定在10月中下旬在本工程的地下部分結(jié)構(gòu)完工后,對地下室的外墻后澆帶進行封擋,特制定本施工方案。
主要施工方法:
一、地下室外墻后澆帶的封擋
1.地下室外墻后澆帶的封擋采用120厚600×1300mm C30混凝土預(yù)制板,由基礎(chǔ)底板開始依次向上排放,上部兩塊預(yù)制板尺寸以現(xiàn)場實測實量尺寸為準。
Hua Rui world wide market a project
After pouring the basement construction plan block shot
To ensure Huarui Shi industry Plaza project in the winter before the construction is ahead of the block shot underground structural envelope, and that Outside waterproofing the basement and backfill progress of the works, tentatively in mid to late 10's underground in the works part of the structure after the completion of the basement wall to block shot after the pouring, construction plan is formulated.
The main construction methods:
First, the basement wall of the block shot after pouring
1. Basement wall block shot after the pouring of the 120 thick 600 × 1300mm C30 concrete precast panels, followed by the start up emissions of the base, the upper two panels size to actual measurements of the field test subject.
