某工程外墻外保溫施工方案.doc
進(jìn)入下載頁
某工程外墻外保溫施工方案
某工程外墻采用聚苯板抹灰外墻外保溫方法施工,根據(jù)現(xiàn)場的實(shí)際情
況特制定如下施工方案。
(一)、施工條件
1、施工現(xiàn)場應(yīng)作到通電、通水,并保持環(huán)境的清潔。
2、外墻和外門窗口施工及驗(yàn)收完畢。
3、操作地點(diǎn)環(huán)境溫度和基層墻體表面溫度均不得低于4℃,風(fēng)力不大
Exterior Insulation Construction of a project plan
Polystyrene board used in a project wall Exterior Insulation construction method, according to the actual site conditions
State construction plan is formulated as follows.
(A), construction conditions
1, the construction site should be conducted with electricity, water, and keep the environment clean.
2, external wall and the outer door window construction and acceptance is completed.
3, the operation temperature and the primary place of wall surface temperatures are not lower than 4 ℃, little wind