室內(nèi)消防管道及設(shè)備安裝工藝技術(shù)交底.doc
進(jìn)入下載頁(yè)
交底內(nèi)容:
室內(nèi)消防管道及設(shè)備安裝
1 范圍
本工藝標(biāo)準(zhǔn)適用于民用和一般工業(yè)建筑的室內(nèi)消防自動(dòng)噴灑系統(tǒng)和消火栓系統(tǒng)的管道及設(shè)備安裝工程。
2 施工準(zhǔn)備
2.1 材料要求:
2.1.1 消防噴灑管材應(yīng)根據(jù)設(shè)計(jì)要求選用,一般采用鍍鋅碳素鋼管及管件,管壁內(nèi)外鍍鋅均勻,無(wú)銹蝕、無(wú)飛刺,零件無(wú)偏加、方扣、絲扣不全、角度不準(zhǔn)等現(xiàn)象。
2.1.2 消火栓系統(tǒng)管材應(yīng)根據(jù)設(shè)計(jì)要求選用,一般采用碳素鋼管或無(wú)縫鋼管,管材不得有彎曲、銹蝕、重皮及凹凸不平等現(xiàn)象。
2.1.3 消防噴灑系統(tǒng)的報(bào)警閥、作用閥、控制閥、延遲器、水流指示器、水泵結(jié)合器等主要組件的規(guī)格型號(hào)應(yīng)符合設(shè)計(jì)要求,配件齊全,鑄造規(guī)矩,表面光潔,無(wú)裂紋,啟閉靈活,有產(chǎn)品出廠合格證。
2.1.4 噴灑頭的規(guī)格、類(lèi)型、動(dòng)作溫度應(yīng)符合設(shè)計(jì)要求,外型規(guī)矩,絲扣完整,感溫包無(wú)破碎和松動(dòng),易熔片無(wú)脫落和松動(dòng)。有產(chǎn)品出廠合格證。
2.1.5 消火栓箱體的規(guī)格類(lèi)型應(yīng)符合設(shè)計(jì)要求,箱體表面平整、光潔。金屬箱體無(wú)銹蝕,劃傷,箱門(mén)開(kāi)啟靈活。箱體方正,箱內(nèi)配件齊全。栓閥外型規(guī)矩,無(wú)裂紋,啟閉靈活,關(guān)閉嚴(yán)密,密封填料完好,有產(chǎn)品出廠合格證。
2.2 主要機(jī)具:
2.2.1 套絲機(jī),砂輪鋸,臺(tái)鉆,電錘,手砂輪,手電鉆,電焊機(jī),電動(dòng)試壓泵等機(jī)械。
2.2.2 套絲板,管鉗、臺(tái)鉗,壓力鉗,鏈鉗,手錘,鋼鋸,扳手,射釘槍?zhuān)规、電氣焊等工具?br />
2.3 作業(yè)條件:
2.3.1 主體結(jié)構(gòu)已驗(yàn)收,現(xiàn)場(chǎng)已清理干凈。
2.3.2 管道安裝所需要的基準(zhǔn)線應(yīng)測(cè)定并標(biāo)明,如吊頂標(biāo)高、地面標(biāo)高、內(nèi)隔墻位置線等。
2.3.3 設(shè)備基礎(chǔ)經(jīng)檢驗(yàn)符合設(shè)計(jì)要求,達(dá)到安裝條件。
2.3.4 安裝管道所需要的操作架應(yīng)由專(zhuān)業(yè)人員搭設(shè)完畢。
2.3.5 檢查管道支架、預(yù)留孔洞的位置、尺寸是否正確。
2.3.6 噴灑頭安裝按建筑裝修圖確定位置,吊頂龍骨安裝完按吊頂材料厚度確定噴灑頭的標(biāo)高。封吊頂時(shí)按噴灑頭預(yù)留口位置在頂板上開(kāi)孔。
3 操作工藝
3.1 工藝流程:
Cards on the table contents:
Fire service piping and equipment installation
1 Scope
This technology is applicable to civil and general industrial building indoor fire sprinkler systems and fire hydrant system piping and equipment installation.
2 construction preparation
2.1 Material Requirements:
2.1.1 fire sprinkler pipe shall be selected according to design requirements, the general use of galvanized carbon steel pipe and pipe fittings, galvanized inside and outside wall of uniform, no rust, no flying stab, plus parts unbiased, side buttons, threaded incomplete perspective not allowed and so on.
2.1.2 pipe hydrant system design requirements should be selected according to the general use of carbon steel pipe or seamless steel pipe, tubing, there is no bending, rust, heavy leather and rough and so on.
2.1.3 fire sprinkler system, alarm valve, the role of valves, control valves, retarders, water flow indicator, pump combiners and other major components of the standard model should meet the design requirements, complete accessories, casting rules, smooth surface, no cracks, flexible and open and close, have a product factory certification.
2.1.4 sprinkler head size, type, operating temperature should be consistent with design requirements, appearance rules, threaded integrity, temperature of non-broken and loose, easy to melt off and no loose pieces. Have a product factory certification.
2.1.5 Hydrant box type should conform to the specifications of the design requirements, box smooth surface, bright and clean. Metal box no rust, scratches, door open and flexible. Founder box, box and complete accessories. Plug valve shape the rules, no crack, opening and closing a flexible, closed tight, sealed packing intact, the product factory certification.
2.2 Main equipment:
2.2.1 threading machine, wheel saws, bench drill, electric hammer, hand wheels, hand drills, welding machines, electric test pressure pump and other machinery.
2.2.2 sets of silk panels, pipe wrench, vise, pressure clamp, chain pliers, hammers, hacksaw, wrench, firearm, down chain, Gas Welding and other tools.
2.3 Operating conditions:
2.3.1 Acceptance of the main structure has been the scene has been cleaned.
2.3.2 Pipe Installation baseline needed to be measured and marked, such as ceiling elevation, ground elevation, location of lines within the walls.
2.3.3 equipment meet the design requirements based upon testing, to installation conditions.
2.3.4 installation of pipelines needed to operate aircraft should be completed professional erection.
2.3.5 checking pipe support, reserve position of holes, size is correct.
2.3.6 sprinkler head installed in accordance with building renovation plans determine the location, ceiling keel ceiling material installed thickness determined by spraying head elevation. Press the spray head ceiling closure reserve position in the roof on mouth opening.
3 Operation Process
3.1 Process: