竣工預(yù)驗收質(zhì)量評估報告.pdf
進(jìn)入下載頁
目錄
一、 工程概況
二、 竣工預(yù)驗收經(jīng)過
三、 竣工預(yù)驗收監(jiān)理結(jié)論
附一: 單位(子單位)工程質(zhì)量控制資料核查記錄
表
附二: 單位(子單位)工程分部和分項工程監(jiān)理抽
檢情況匯總表
附三: 單位(子單位)工程安全和功能檢測資料核
查及主要功能抽查記錄
附四: 單位工程觀感質(zhì)量監(jiān)理檢查表
附五: 單位(子單位)工程監(jiān)理抽查/見證試驗情況
匯總及說明
附六: 單位(子單位)竣工預(yù)驗收遺留問題的整改結(jié)果
附七: 單位(子單位)工程質(zhì)量預(yù)驗收記錄表
附八: 竣工預(yù)驗收小組成員名單及分工表
Directory
First, project survey
Second, after completion of pre-acceptance
Third, completion of pre-inspection supervision Conclusion
Annex 1: Unit (sub-unit) project quality control data verification records
Table
Annex 2: Unit (a unit) works Division and the sub-project supervision pumping
Prosecution case summary
Annex 3: unit (a unit) engineering data security and functionality testing of nuclear
Charlie and the main function of sample records
Annex 4: Observation Quality Supervision Unit Checklist
Annex 5: Units (sub-unit) project supervision checks / witness test case
Summary and description
Annex 6: Unit (sub-units) completed the rectification of problems left over from pre-inspection results
Annex 7: Unit (sub-unit) project quality pre-inspection log
Annex 8: List of completed pre-inspection team members and division table
