一、編制依據(jù)
(一)中國(guó)網(wǎng)通集團(tuán)公司四川省分公司關(guān)于中國(guó)網(wǎng)通西南通信樞紐大樓的相關(guān)要求。
(二)中國(guó)建筑西南設(shè)計(jì)研究院的《中國(guó)網(wǎng)通西南通信樞紐大樓》工程施工圖(設(shè)計(jì)號(hào):06103-01)。
(三)成都市興蜀勘察基礎(chǔ)工程公司提供的場(chǎng)地詳細(xì)勘察階段巖土工程勘察報(bào)告書(shū)。
(四)國(guó)家現(xiàn)行的施工和驗(yàn)收規(guī)范、規(guī)程、標(biāo)準(zhǔn)和關(guān)于建筑施工管理等方面的技術(shù)文件、圖集以及相關(guān)的法律法規(guī)。
(五)質(zhì)量管理體系(依據(jù)GB/T19001-2000標(biāo)準(zhǔn))。
環(huán)境管理體系(依據(jù)GB/T24001-1996標(biāo)準(zhǔn))。
職業(yè)健康安全管理體系(依據(jù)GB/T28001-2001標(biāo)準(zhǔn))。
二、編制說(shuō)明
(一)在接到中國(guó)網(wǎng)通集團(tuán)公司四川省分公司關(guān)于中國(guó)網(wǎng)通西南通信樞紐大樓的相關(guān)要求和設(shè)計(jì)圖紙后,公司組織工程技術(shù)人員對(duì)該要求和圖紙進(jìn)行仔細(xì)認(rèn)真的研究,反復(fù)閱看,召開(kāi)了預(yù)備會(huì),針對(duì)本工程的重、難點(diǎn)進(jìn)行研究,方案論證對(duì)比,力求編制的施工組織設(shè)計(jì)科學(xué)、合理、詳盡,具有很強(qiáng)的針對(duì)性和可操作性。
(二)在現(xiàn)場(chǎng)進(jìn)行踏勘實(shí)測(cè)實(shí)量后,獲得了寶貴的第一手?jǐn)?shù)據(jù),對(duì)場(chǎng)地、周邊環(huán)境、地形地貌、圍擋情況、施工供水排水供電情況,有了一定的了解,這對(duì)施工組織設(shè)計(jì)的制定起著重要作用。
(三)我公司經(jīng)過(guò)多年的運(yùn)作,積累了較為豐富的施工經(jīng)驗(yàn),形成了1, prepared on the basis
(1) China Netcom China Netcom Group Corporation Sichuan Province, southwest branch communications hub on the relevant building requirements.
(2) China Southwest Architectural Design and Research Institute's "communications hub of Southwest China Netcom Building" project construction drawings (design No. :06103-01).
(C) Revive Sichuan Chengdu survey based engineering company to provide detailed investigation stage of the site geotechnical investigation report.
(D) current national construction and acceptance of norms, rules, standards, and on construction management, technical documents, Atlas and the relevant laws and regulations.
(E) quality management system (based on GB/T19001-2000 standard).
Environmental management system (based on GB/T24001-1996 standard).
Occupational Health and Safety Management System (based on GB/T28001-2001 standard).
Second, the preparation instructions
(A) Upon receipt of Sichuan Province, China Netcom Group, China Netcom, Guan Yu Fen Gongsi communications hub building southwest of the relevant requirements and design drawings, the company's tissue engineering and technical personnel of such request and drawings carefully careful study, repeated access to view, held the preparation will, for the construction of heavy and difficult to study, the program demonstrated contrast, sought to prepare the construction organization design scientific, rational, detailed, highly relevant and practical.
(B) measured in the field survey and investigation, after the actual volume, gained valuable first-hand data on the site, surroundings, topography, Wei Dang case, construction drainage water supply situation, with some understanding, which construction organizations Design plays an important role in the formulation.
(C) the operation of our company over the years has accumulated more experience in construction, formed