昌萬(wàn)公路建設(shè)項(xiàng)目竣工檔案資料管理報(bào)告
一、項(xiàng)目概況
南昌至萬(wàn)年公路建設(shè)項(xiàng)目(原稱南昌至峽嶺公路建設(shè)項(xiàng)目,2003年11月經(jīng)上級(jí)批準(zhǔn),更稱為現(xiàn)名)依據(jù)江西省發(fā)展計(jì)劃委員會(huì)《關(guān)于南昌至峽嶺公路工程可行性研究報(bào)告的批復(fù)》(贛計(jì)能交字〔1999〕37號(hào))、江西省發(fā)展計(jì)劃委員會(huì)《關(guān)于南昌至峽嶺公路工程初步設(shè)計(jì)的批復(fù)》(贛計(jì)設(shè)審字〔2002〕46號(hào))、江西省發(fā)展計(jì)劃委員會(huì)《關(guān)于南昌至峽嶺公路重大設(shè)計(jì)變更及有關(guān)概算調(diào)整的批復(fù)》(贛計(jì)設(shè)審字〔2003〕341號(hào))。該項(xiàng)目于2002年6月28日正式開(kāi)工,2004年5月20日進(jìn)行了交工驗(yàn)收,2004年6月28日正式建成通車。
(一)建設(shè)規(guī)模及標(biāo)準(zhǔn)
南昌至萬(wàn)年(峽嶺)二級(jí)公路始于南昌市北京東路延伸段與尤(口)氨(廠)公路交界處,沿鄱陽(yáng)湖南岸修建。途經(jīng)南昌縣、進(jìn)賢縣、余干縣、萬(wàn)年縣,終點(diǎn)在萬(wàn)年縣境內(nèi)的峽嶺與206國(guó)道相接。主線總長(zhǎng)108.95公里,連接線長(zhǎng)5.92公里。工程總投資原為54055.34萬(wàn)元,經(jīng)省計(jì)委(贛設(shè)審字[2003]341號(hào))文件批復(fù),調(diào)整后的概算為59034.78萬(wàn)元。
昌萬(wàn)公路是南昌市的東出口和我省北部地區(qū)主要交通要道之一,2002年列入省政府計(jì)劃建設(shè)的
Cheong Wan Road Construction Project Management Report Archives
1 Project Overview
Nanchang to years of highway construction projects (formerly known as Ridge Road Nanchang to the Gap Project, approved in 2003 11 period higher, even as the current name) based in Jiangxi Province Development Planning Commission "to gorge on Ridge Road, Nanchang, project feasibility study report Reply "(Gan dollars to pay 〔1999〕 37 characters), the Jiangxi Provincial Development Planning Commission" on Gap Ridge Road Nanchang to the preliminary design of the approved project "(trial Gan designed, the word 〔2002〕 46), the Jiangxi Provincial Development Plan Committee "on Gap Ridge Road Nanchang to major design changes and approved the budget adjustment" (Gan designed, the trial 〔2003〕 341 words). The project was June 28, 2002 began on May 20, 2004 was Labor Exchange acceptance, June 28, 2004 officially opened to traffic.
(A) the construction scale and standard
Nanchang to years (Gap Ridge) two road starts extension of Beijing East Road, Nanchang City, and in particular, (I) ammonia (factory) road junction, built along the south bank of Poyang Lake. Via Nanchang County, Jinxian, Yugan County, Wannian County, ending at County's Gap Ridge million years and 206 national highway connecting. Total length of 108.95 km main line, cable length 5.92 km. The total project investment is 540.5534 million yuan original, by the Provincial Planning Commission (set up trial Gan [2003] No. 341) issued by the provincial, the adjusted estimated 590,347,800 yuan.
Cheong Wan Road, Nanchang City, the East is the northern province exports and one of the main thoroughfares, in 2002 the provincial government plans to include the construction of