深圳市田園海上風(fēng)光旅游區(qū)游覽步道區(qū)工程施工技術(shù)總結(jié).doc
進(jìn)入下載頁(yè)
施工技術(shù)總結(jié)
深圳市田園海上風(fēng)光旅游區(qū)游覽步道區(qū)工程經(jīng)過我司近十個(gè)月努力奮戰(zhàn),已勝利竣工。在此感謝建設(shè)單位、監(jiān)理單位和其它各相關(guān)質(zhì)監(jiān)單位的大力支持與配合。
一、工程概況
本工程地處沙井鎮(zhèn)民主村田園路以北,毗鄰農(nóng)耕文明館展區(qū),總建筑面積992.3㎡,基中服務(wù)建筑263.3㎡,其它729㎡。本工程由西向東依次為服務(wù)建筑、休息廊、公廁,三者已由田園路為進(jìn)口的進(jìn)化大道連接,西側(cè)布置雕塑、花園、茶園等景點(diǎn)。其中,服務(wù)建筑共一層,為本工程設(shè)計(jì)主體構(gòu)造為鋼體蓬架結(jié)構(gòu)。由平面間距尺寸為4.5m×4.5m鋼柱拉張拉膜組合而成,共計(jì)七座,全部采用輕質(zhì)泰柏板墻體,復(fù)合壓型鋼板屋面結(jié)構(gòu),服務(wù)建筑為三類防雷建筑場(chǎng),休息廊位于本區(qū)中部靠東,弧形平面,內(nèi)弧平徑249m,全部木質(zhì)結(jié)構(gòu),螺栓連接,公廁位于東側(cè)進(jìn)化大道口。管線中,污水管徑200mm,與田園路市政污水管接通。雨水管徑有d300、d400、d500三種,并設(shè)φ100磚砌圓形雨水檢查井和單雨水口,與市政雨水管連通。給水管室外埋深0.7m,室內(nèi)為明裝,由田園路市政給水管引入。綠化澆灌給水管采用PVC管引自補(bǔ)水管,并在相應(yīng)位置設(shè)室外灑水栓,埋
Construction Technology
Shenzhen Tianyuan Hai on the trails around the scenic spot of the Division works through my efforts in recent months fighting has been successfully completed. Like to thank the construction unit, supervision unit and other relevant quality supervision units in the support and cooperation.
First, project survey
The project is located in the town of democracy Murata Road, north of the manhole adjacent to agricultural civilization museum exhibition, with a total construction area of 992.3 square meters, building service based in the 263.3 square meters, the other 729 square meters. The project followed the service from west to east building, rest corridor, public toilets, three from rural road to the evolution of imports of road connecting the west layout sculpture, garden, tea garden and other attractions. Among them, the service building of floor-based design of the main body constructed of steel frame structures Peng. Distance from the plane size of 4.5m × 4.5m steel column pull-tensioned membrane composed of a total of seven, all with light TAP wall, composite steel plate roof structure, service building construction field for the three types of lightning , break Gallery is located in this area by the East Central, curved surface, within the arc flat track 249m, all wooden structures, bolt connection, public toilets in the evolution of major road junction east. Pipeline, the sewage pipe diameter 200mm, and the rural way connected to municipal sewers. Diameter rainwater have d300, d400, d500 three, and let φ100 circular brick water wells and one water port inspections, with municipal storm sewer connection. Depth to water outdoor 0.7m, indoors for the next installation, municipal water supply by the introduction of rural road. Green water use PVC pipe to the water drawn from fill pipe, and outdoor watering in the corresponding position of the bolt, buried
