基礎(chǔ)回填土施工方案
一、 施工準(zhǔn)備:
1、 土:宜優(yōu)先利用槽坑中挖出的土,不足部分的土,可用其它的素土回填,土中不含有機(jī)雜質(zhì),含水量符合規(guī)定。
2、 回填土前,基礎(chǔ)工程經(jīng)過(guò)質(zhì)監(jiān)、設(shè)計(jì)、勘察進(jìn)行驗(yàn)收通過(guò),并辦完驗(yàn)收手續(xù)。
3、 基底坑積水和有機(jī)雜質(zhì)已清理完。
Foundation backfill construction program
First, construction preparation:
1, soil: should give priority to use slot pits dug in the soil, less than some of the soil, can be other factors of soil backfill, the soil does not contain organic impurities, water content compliance.
2, backfill before the foundation engineering through quality supervision, design, inspection for acceptance by, and after finishing acceptance procedures.
3, basal pit water and organic impurities are cleaned.