1、所有進(jìn)入施工現(xiàn)場人員必須正確佩戴安全帽,并禁止外來閑雜人員進(jìn)入施工現(xiàn)場。
2、電工、挖掘機(jī)操作手等特殊工程人員必須持證上崗。
3、開挖基坑、管溝當(dāng)深度超過1.5米(含1.5米),必須事先采取支撐防護(hù)措施。
4、離坑、溝邊八十厘米內(nèi)或深度二分之一內(nèi),不準(zhǔn)堆放大量材料和設(shè)備等,三米內(nèi)不準(zhǔn)汽車行走,確實(shí)因場地限制需堆放材料、設(shè)備的,確保不得超高塌方。
5、不準(zhǔn)在腳手架立柱邊、鋼井架、施工升降機(jī)和塔吊基礎(chǔ)邊、開挖溝坑,并注意觀察附近建筑物有無沉降。
6、做好已開挖溝、坑的防護(hù)每個(gè)工作面,樹立“注意安全”、“當(dāng)心墜落”等安全標(biāo)志牌和夜間紅燈警示。
7、如地下水豐富需抽水,放潛水泵時(shí),不準(zhǔn)先將插頭插進(jìn)插座,不準(zhǔn)先通電,應(yīng)等下方人員上來后,按程序插好插好插座→再合閘通電。抽水后,先拉閘斷電→拔開插頭→提潛水泵→人再下去作業(yè)。嚴(yán)禁人未上來就送電。
8、施工中要防止墜物傷人,吊裝作業(yè)時(shí),吊物垂直下方不得有人。
9、用電設(shè)備須裝設(shè)漏電開關(guān),并在班前試驗(yàn)其有效性,無效不得使用,夜間施工準(zhǔn)備好照明設(shè)備。
10、現(xiàn)場材料堆放整齊。電纜、電線理順,不得
1, all to the construction site must wear a helmet, and prohibits foreign people without fixed duties to the construction site.
2, electricians, excavators and other special projects manipulator must certificates.
3, excavation pit, trench when the depth of more than 1.5 meters (including 1.5 meters), must be taken to support the protective measures in advance.
4, away from the pits of edge 80 cm depth within one-half or inside, are not allowed to pile up a lot of materials and equipment, vehicles are not allowed to walk within three meters, is indeed due to space limitations should be stacked materials, equipment, and ensure that no high landslide .
5, are not allowed in the side column scaffolding, steel derrick, construction lifts and tower crane base side, open pit trenching and observe whether the settlement of nearby buildings.
6, do have open ditches, pits the protection of each face, establish a "safety", "Beware of falling" and other safety warning signs and red lights at night.
7, such as groundwater pumping be rich, let submersible pump, the first plug inserted into the socket are not allowed not allowed the first power, should such come under the staff, the well plugged according to the procedure and then closing outlet → power. After pumping, first disconnect the plug blackouts → → → submersible pumps were again put down operations. Prohibited person is not up would send electricity.
8, construction materials to prevent fall injuries, lifting operations, the hoist was not perpendicular to the bottom.
9, electrical equipment shall be installed leakage switch, and test their effectiveness in the class before, invalid shall not be used, ready for lighting at night.
10, on-site materials stacked neatly. Cables, wires straighten out, not
 

下載地址

前往下載

日本黄韩国色三级三级三| 亚洲欧洲一区二区天堂久久| 日韩人妻久久中文字幕| 久久亚洲欧美日本精品| 性欧美videofree高清精品| 亚洲欧洲日产国码久在线| 青草视频在线观看| 香蕉伊蕉伊中文视频在线| 护士张开腿被奷日出白浆| 久久久久无码精品国产AV| 无码人妻丝袜在线视频| 欧美熟妇喷潮xxxx| 久久精品aⅴ无码中文字幕| 国内精品乱码卡一卡2卡麻豆| 亚洲av无码国产精品麻豆天美| 成人午夜免费无码视频在线观看| 欧美激情综合色综合啪啪五月| 精精国产XXX在线观看| 国产另类ts人妖一区二区| 国产精品美女久久久久久大全| av 日韩 人妻 黑人 综合 无码| 日韩大片在线永久免费观看网站| 国产极品丝尤物在线观看| 亚洲自拍系列在线观看| 亚洲VA中文字幕无码一二三区| 国产在线观看高清不卡| 国产极品美女网站在线观看| japanesexxxx日本妇伦| 亚洲国产精品va在线播放| 久久天堂综合亚洲伊人HD| 欧美在线一区二区三区精品| 国产亚洲制服免视频| 男人一天堂精品国产乱码| 爆爽久久久一区二区又大又黄又嫩| 少妇被粗大的猛烈进出免费视频| 男女18禁啪啪无遮挡激烈网站| 久久av无码精品人妻出轨| 亚洲成av人片在线播放无码| 久久亚洲国产精品亚洲老地址| 农村老熟妇乱子伦视频| 性动态图无遮挡试看30秒|