箱涵基坑支護(hù)技術(shù)交底.doc

更新時(shí)間: 2024-02-23
下載權(quán)限: 免費(fèi)會(huì)員
文件大。 0.01 MB
文件類型: .doc
瀏覽次數(shù):
上傳會(huì)員: 382957161
所屬欄目: 巖土技術(shù)交底
進(jìn)入下載頁(yè)
資料簡(jiǎn)介

交底內(nèi)容:
1. 對(duì)實(shí)際開(kāi)挖深度≤5.0m地段的基坑,上面1.2m采用1:1放坡,坡面噴射C15混凝土硬化層,下面采用拉森鋼板樁支護(hù);若遇到相對(duì)較差土層,采用密排拉森鋼板樁支護(hù)。鋼板樁頂設(shè)一道支撐,支撐選用32號(hào)雙翼工字鋼。
2. 對(duì)實(shí)際開(kāi)挖深度>5.0m地段的基坑,采用密排鋼板樁支護(hù),樁頂以下0.5m設(shè)一道支撐,支撐選用32號(hào)雙翼工字鋼,水平間距不大于4.0m。
3. 施工過(guò)程中要加強(qiáng)對(duì)基坑的監(jiān)測(cè),每隔20.0m設(shè)一個(gè)沉降和位移觀測(cè)點(diǎn),發(fā)現(xiàn)有異常情況時(shí)及時(shí)采取應(yīng)急處理措施,如采取回填反壓土或坑頂卸土的方法。
4. 基坑降水采用井點(diǎn)降水,保證水位在坑底以下0.5m;施工過(guò)程要做好排水工作,坑底、坑頂均應(yīng)設(shè)排水溝(400×350)和集水井(1000×1000×800)。
5. 基坑土方開(kāi)挖采取分段、分層開(kāi)挖,每層開(kāi)挖深度不大于1.5m,每段開(kāi)挖長(zhǎng)度小于40.0m。坑底以上30.0cm土采用人工開(kāi)挖,以免擾動(dòng)原狀土。
基坑施工過(guò)程中,在2.0m范圍內(nèi)嚴(yán)禁大型載重車輛行走,保證基坑安全;同時(shí)基坑周邊應(yīng)設(shè)鋼圍欄。
Cards on the table contents:
1. On the actual excavation site of the excavation depth ≤ 5.0m, 1.2m above the 1:1 cut slope, slope jet C15 concrete hardening, the following support by Larsen sheet pile; If they are in relatively poor soil using closely spaced steel sheet pile retaining Larsen. Set up a steel sheet pile head support wings 32, I-beam support used.
2. On the actual excavation depth> 5.0m lot of excavation, using closely spaced steel sheet piles, pile top the following set up a 0.5m support wings 32, I-beam support used, the horizontal spacing of not more than 4.0m.
3. The construction process should strengthen the foundation of the monitoring, at intervals of 20.0m set up a settlement and displacement of observation point, when an abnormality is detected in time to take contingency measures, such as to backfill compacted soil or pit the top anti-dumping earth approach.
4. Foundation pit dewatering used to ensure the water level at the Bottom of the following 0.5m; the construction process to make the drainage work, pit bottom, pit roof drains should be located (400 × 350) and the set of wells (1000 × 1000 × 800).
5. Earthwork excavation pit to section, layered excavation, excavation depth of each layer is not greater than 1.5m, the length of each piece of excavation is less than 40.0m. Bottom 30.0cm above artificial excavation of soil, undisturbed soil to prevent disturbance.
Foundation construction process, is strictly prohibited in the 2.0m range of large-scale load vehicles to ensure the Pit; the same time should be set steel fence around the pit.
 

下載地址

前往下載

欧美日韩国产图片区一区| 人妻的诱惑| 无码人妻久久一区二区三区不卡| 一本久道久久综合狠狠爱| av天堂午夜精品一区二区三区| 日韩无套内射高潮| 国产精品自产拍2021在线观看| 成全高清在线播放电视剧| 日韩精品一区二区三区激情视频 | 推油少妇久久99久久99久久| 狠狠躁天天躁中文字幕无码| 999福利激情视频| 日本成人字幕在线不卡| 熟妇人妻久久精品一区二区| 无码免费午夜福利看片| 国产成人综合久久精品推| 精品综合久久久久久98| 国产在线拍揄自揄视频网试看| 2020久久国产综合精品swag| 91久久精品无码人妻系列| 十八禁无码免费网站| 成人a免费α片在线视频网站| 狂野欧美性猛交xxxx| 最近2019中文字幕免费看| 精品国产成人一区二区| 91精品aⅴ无码中文字字幕蜜桃 | 国产一区二区午夜福利| 亚洲性日韩一区二区三区| 日韩精品中文字幕人妻| 国产精品爱久久久久久久| 色哟哟www网站入口成人学校| 亚洲欧美色综合影院| 亚洲国产精华液2020| 蜜芽一区二区国产精品| AV老司机亚洲精品天堂| 成人AV专区精品无码国产| 国产精品午夜福利精品| 亚洲国产精品高清在线电影| 一区二区中文字幕av| 国产精品剧情亚洲二区| 国产在线无码视频一区二区三区 |