一、 施工準(zhǔn)備
(一) 施工器具
耙子、掃把、白線、鋁合金刮杠、尖鍬、平鍬、混凝土地泵、插人式振搗器、平板振搗器、配電箱、塔吊、水泵等。
(二) 技術(shù)準(zhǔn)備
1、 混凝土申請:澆筑棍凝±前,預(yù)先與混凝土供應(yīng)單位辦理預(yù)拌混凝土委托單及澆灌申請,委托單的內(nèi)容包括:混凝土強(qiáng)度等級、方量、坍落度、初凝終凝時(shí)間、是否加抗凍劑以及澆筑時(shí)間等。
2、 所有機(jī)具均應(yīng)在澆筑混凝土前進(jìn)行檢查,同時(shí)配備專職技工,隨時(shí)檢修。
3、 在混凝土澆筑期間,要保證水、電、照明不中斷。為了防備臨時(shí)停水停電,事先應(yīng)在現(xiàn)場準(zhǔn)備一定數(shù)量的人工攪拌和振搗用工具,以防出現(xiàn)意外施工縫。
4、 根據(jù)施工方案準(zhǔn)備必要的塑料布、保溫材料及測溫用具等。
(三) 作業(yè)條件
1、 各種專業(yè)管線已埋設(shè)完畢,鋼筋隱檢、模板預(yù)檢已完成。
2、 施工人員的通道架設(shè)、泵管的架子已搭設(shè)完畢。
3、 振搗設(shè)備調(diào)試正常及備有一定數(shù)量的振搗棒。
4、 放料處與澆筑點(diǎn)的聯(lián)絡(luò)信號已準(zhǔn)備就緒。
5、 勞動(dòng)力安排已妥當(dāng),名單已上報(bào)。
6、 與城管部門協(xié)調(diào)好,確保混凝土的順利澆筑。
7、 檢查墻、柱插筋位置、數(shù)量,預(yù)埋件的位置、數(shù)量,預(yù)留洞的位置、數(shù)量,模板接縫是否嚴(yán)密,模板隔離劑涂刷情況、支撐系統(tǒng)的承載能力、剛度和穩(wěn)定性是否滿足要求。
8、 板內(nèi)是否清理干凈,如鐵絲、冷擠壓套管、木屑、
First, construction preparation
(A) Construction equipment
Rake, broom, white wire, aluminum scrape bar, pointed shovel, flat shovel, concrete pump, insert-type vibrators, plate vibrators, distribution box, tower cranes, pumps and so on.
(B) of the technical preparations
1, concrete application: placing the stick ± before coagulation, pre-processing and concrete ready-mixed concrete supply unit and the water for a single commission, commission orders include: concrete strength grade, square volume, slump, initial setting and final setting time, whether Add antifreeze, as well as pouring time.
2, all equipment should be inspected before pouring concrete at the same time, with full-time mechanic, maintenance at any time.
3, during the concrete pouring, to ensure water, electricity, lighting is not interrupted. In order to prepare for temporary power outages without water, a certain amount in advance to be prepared in the field of artificial mixing and vibrating tools, to protect against unforeseen construction joints.
4, according to the construction program to prepare the necessary plastic sheeting, insulation material and temperature measuring equipment and so on.
(C) Operating conditions
1, various professional pipeline has been laid finished steel implicit review, templates, pre-screening has been completed.
2, construction workers erected the channel, pipe rack erection has been completed.
3, vibration device debugging of normal and stick with a certain amount of vibration.
4, discharge liaison office and casting point the signal is ready.
5, labor arrangements are appropriate, the list has been submitted.
6, and urban management department to coordinate and ensure the smooth concrete pouring.
7, check the walls, columns Reinforcing location, quantity, location of embedded items, quantity, reserve position of the hole, the number of seams are tight template, template release agent brushing situation, support system, carrying capacity, rigidity and stability of whether it meet the requirements.
8, plate is clean, such as wire, cold extrusion casing, wood chips,